Lewes Gym

With a new Gym Facility opening in Lewes West Sussex and the time scale at a premium to meet a completion date to tie in with a fixed opening date, BRAC Projects were tasked with supplying and installing the male and female changing facilities.

This was a very challenging project with requirements changing on a regular basis to meet the client’s needs.

Using solid grade laminate from the Polyrey Range to meet the demands of a hard wearing, clean and water-resistant environment, the installations look aesthetically pleasing to the eye but also remain functional.

We used colours specified by the client and installed wall panels in solid grade direct to the walls. The cupboards in solid grade laminate give an appearance as being part of the walls which were manufactured to suit using the minimum amount of space whilst allowing access to service the shower pumps.

Each IPS panel to the toilets and showers to conceal all of services are removeable if required to allow suitable access to the services.

All of the cubicles are manufactured from floor to ceiling using a satin anodized fixed framework to allow for maximum privacy within what is a busy and confined space with direct access straight into the gym area.

The client was very impressed with the completed project and congratulated BRAC Projects on their patience and feedback on what was a challenging project to achieve their final requirements.